Media Installed:
4 modules with 60,275 ft2 of BioWeb fixed media

Results:
Meeting discharge permit requirements

 

Green Cove Springs, FL

In November of 2002 BioWeb was installed in the Harbor Road WWTP at Green Cove Springs, FL as part of a plant upgrade to .75 MGD average flow. The plant was previously not able to nitrify and was facing a new ammonia permit. After installation of the BioWeb media the plant achieved complete nitrification and denitrification to below 10 mg/l Total Nitrogen.

Additionally the sludge yield for the plant was reduced by 50% and the plant was able to achieve SVIs below 100 even at extremely high MLSS concentrations.