
| Tabernacle, New Jersey |
|
|
|
|
The wastewater treatment facility at the Kenneth R. Olson Middle School in Tabernacle, NJ needed to be modified to provide enhanced total nitrogen removal. The engineer elected to use Entex BioPortz moving media in the pre-anoxic zone to minimize the space required and to fix the denitrifying biology in the basin under highly variable loading conditions. 612 ft3 of BioPortz media with over 107,625 ft2 of biologically active surface area
|