Windsor Locks, CT. gradient right
Entex logo

Windsor Locks, CT

  HOME  INDUSTRIES  CHALLENGES  SYSTEMS  SOLUTIONS  INSTALLATIONS  OUR TEAM  CONTACT US


Windsor Locks, CT

Design Engineer:
Peter Valinski, Vice President
Tighe & Bond Consulting Engineers
Westfield, MA

Operational Contact:
Gary Kuczarski, Superintendent
Town of Windsor Locks WPCA
Windsor Locks, CT

Results:
Full nitrification (100 lbs/day NH3-N removed) and denitrification, SVIs below 100

Media Installed:
8 BioWeb modules, 4 in each of two parallel trains, 37,440 ft2

Windsor Locks, CT

This 1.43 MGD treatment plant was upgraded to denitrify using the MLE process in August 2001. BioWeb was added to increase biomass for nitrification/denitrification. A performance test was measuring effluent ammonia in two parallel trains, one with BioWeb and one without.

BioWeb removed approximately 100 lbs more ammonia per day than the plant could without BioWeb. After testing was complete, additional BioWeb modules were installed at the plant.